Structural Estimating
Structural Estimating Services
Takeoffs and estimates for structural contractors and builders — steelwork, concrete frames, timber and light-gauge framing measured from your structural drawings and schedules.
- SectionUB 457×191×67
- Length, grid to grid6.00 m
- Mass per metre67.1 kg/m
- Weight of this beam403 kg
- Every memberby section → t
Structural drawings, member schedules, framing plans, specifications
Member schedules, tonnage summary, cost estimate
Excel, PDF or your template
Typically 48 hours for standard estimates
How we measure steel
See a Structural Takeoff in 3D
Columns, beams and bracing are counted from the general arrangement, measured between grid lines and weighed by section — then connections, bolts and base plates are added, so the tonnage is ready to price.
- The general arrangement sets out the column grid — four lines by three at 6.00 m bays — and the floor levels the frame is built to.
- Every column is counted on the grid and measured to its full height, then weighed by section from the steel tables.
- Primary beams on each grid line are measured between column centres at both levels and weighed by section.
- Tie beams on the column lines and secondary beams across each bay are measured, counted and weighed in turn.
- Bracing bays are read from the elevations, with every diagonal measured corner to corner, storey by storey.
- Connections, bolts and base plates are counted joint by joint and an allowance added, so the tonnage is ready to price.
| Item | Qty | Unit |
|---|---|---|
| Columns UC 254×254×73 · 12 nr | 7.01 | t |
| Primary beams UB 457×191×67 · 18 nr | 7.24 | t |
| Tie beams UB 356×171×45 · 16 nr | 4.32 | t |
| Secondary beams UB 254×146×31 · 12 nr | 2.23 | t |
| Bracing CHS 114.3×5.0 · 16 nr | 1.56 | t |
| Connections end plates | 92 | nr |
| Bolts M20 grade 8.8 | 576 | nr |
| Base plates 48 HD bolts | 12 | nr |
| Total steelwork +5% connections | 23.5 | t |
| Delivered as an Excel takeoff with a marked-up GA and member schedule | ||
Illustrative two-storey steel frame — sample figures, not a quotation.
Scope
What’s Included
The scope is confirmed with you before work starts, so you know exactly what will be measured and priced.

- 01
Structural steel
Beams, columns, bracing and purlins measured by section size and length, then converted to tonnes; plates and connections from the details.
- 02
Concrete frames
Columns, beams, slabs and walls in m³ by element and level, with formwork in m² and reinforcement in tonnes.
- 03
Timber & light-gauge
Studs, plates, noggings, lintels, joists, bearers and rafters in lineal metres by size and grade; trusses and connectors counted.
- 04
Foundations
Pad and strip footings, pile caps and ground beams by element; piles by number and length.
- 05
By member type
Tonnage, lengths and counts grouped by member type, section size and level.
- 06
Schedules
Structural schedules and summaries for pricing.
Deliverables
What You Receive
- Structural quantity schedules
- Steel tonnage summary with member lists by section size
- Timber and light-gauge framing quantities by size and grade
- Supporting takeoff and marked-up drawings showing what was measured
- Assumptions and exclusions, including any connection allowances
- Lengths measured grid to grid
- Connections allowed at 5% of steel mass
- Excludes bolts, paint and fire protection
- Drawings S-101 to S-204, revision C
| Mark | Section | Length m | Mass t |
|---|---|---|---|
| B1 | UB 457×191×67 | 24.0 | 1.61 |
| B2 | UB 305×165×40 | 66.0 | 2.64 |
| C1 | UC 254×254×73 | 42.0 | 3.07 |
| Connections allowance · 5% | 0.37 | ||
| Total steel | 7.69 t | ||
Need structural estimating every week? Get your own dedicated estimator.
Measuring structural steel, concrete frames and timber framing on a regular basis? Add a dedicated estimator to your team who prepares structural quantities your way, project after project.
- The same estimator on every project
- Works in your templates and formats
- Learns your rates, trades and standards
- Support arranged around your pipeline


How it works
Simple From Start to Finish
Send drawings
Share drawings, scope and deadline.
Scope review
We confirm deliverables and timeframe.
Takeoff & estimate
Quantities measured and organised.
Review & delivery
Checked, then delivered in your format.
FAQ
Common Questions
Yes. Each member is measured by section size and length from the structural drawings and member schedules, then converted to tonnes using the section’s mass per metre. Plates, cleats and bolts are measured from connection details where shown, or added as a stated percentage allowance where they are not.
Yes. Wall, floor and roof framing quantities can be prepared from framing plans and details.
No. Our work is estimating and quantities; shop drawings are outside our scope.
Related
Related Services

Concrete Estimating
Concrete quantities, reinforcement and related construction quantities.
Learn more
Cladding Estimating
Wall cladding, façade panels, subframes, flashings and trims quantities and costs.
Learn more
Whole Building Estimating
Every trade, from substructure to finishes and services, measured and priced in one complete estimate.
Learn moreGet support with structural estimating
Send your drawings and scope. Standard estimates are typically delivered within 48 hours; for larger or complex projects we confirm the delivery date after reviewing the scope, before any work begins.

