Whole Building Estimating

Whole BuildingEstimating

A single estimate covering the whole building, for builders and head contractors — every trade from substructure to finishes and services, measured from your drawings and organised by trade package or element.

Need this ongoing? Get a dedicated estimator
Multi-storey concrete-framed building under construction, with tower cranes
Service 06

Typical inputs

Full drawing setSpecificationsFinishes schedulesServices drawings

Outputs

Full BOQEstimate summaryCost per m²

Formats

ExcelPDFYour template

How we measure a whole building

See a Whole Building Takeoff in 3D

Every trade is measured from the one drawing set — substructure, frame, roof, envelope, internal walls, finishes and services — package by package, so the whole building lands in a single BOQ ready to price.

  1. Pad footings and ground beams are measured from the foundation plan, then the ground slab by area and thickness.
  2. Columns and beams are counted on the grid and weighed by section; upper floors are measured slab by slab.
  3. The roof is measured inside the parapets, with insulation and membrane taken from the roof plan.
  4. Cladding is measured elevation by elevation, net of openings, and every window is counted from the schedule.
  5. Partitions are measured by length and height, and floor finishes room by room from the finishes schedule.
  6. Ductwork, pipework and cable tray are measured run by run from the services drawings, risers included.
  7. Every package is summarised by element against the gross floor area, so the BOQ is ready to price per m².
Whole building takeoff for the model shown (illustrative)
ItemQtyUnit
Substructure pads, ground beams, slab77.5m³
Steel frame 12 columns · 51 beams25.4t
Upper floors composite slab · L1, L2533m²
Roof membrane & insulation253m²
External envelope cladding net · 60 windows582m²
Internal walls 180 m partitions486m²
Floor finishes 3 floors760m²
Building services duct · pipe · cable tray280lm
Gross floor area basis for cost per m²800m²
Delivered as a full BOQ in Excel with marked-up drawings and an elemental summary

Illustrative three-storey office building — sample figures, not a quotation.

Scope

What’s Included

The scope is confirmed with you before work starts, so you know exactly what will be measured and priced.

01

Substructure

Excavation, footings, ground slabs, basements and below-ground drainage.

02

Frame & upper floors

Concrete, steel or timber frames, suspended slabs, stairs and reinforcement.

03

Roof

Roof structure, coverings, flashings, insulation and roof drainage.

04

External envelope

External walls, cladding, windows, external doors and glazing.

05

Internal walls & doors

Partitions, linings, internal doors and ironmongery.

06

Finishes

Wall, floor and ceiling finishes, tiling and painting.

07

Fittings & joinery

Kitchens, joinery, sanitary fittings and fixed equipment.

08

Building services

Electrical, plumbing and mechanical services, plus fire services and lifts where shown.

09

External works & preliminaries

Paving, landscaping and site drainage, with preliminaries, contingencies and margins as separate items.

Deliverables

What You Receive

  • 01

    Complete Bill of Quantities in Excel, covering every trade and formula-linked to the summary

  • 02

    Estimate summary by trade or by element, with cost per m² of gross floor area

  • 03

    Material, labour and plant breakdowns (when pricing is requested)

  • 04

    Marked-up drawings showing what was measured

  • 05

    Assumptions, exclusions, provisional sums and clarifications

Ideal for

Who It’s For

  • Builders and head contractors
  • Design and build contractors
  • Developers and property owners
  • Quantity surveyors needing extra capacity

Dedicated estimator available

Need whole building estimates every week? Get your own dedicated estimator.

Pricing complete projects on a regular basis? Add a dedicated estimator to your team who prepares full building estimates in your format, project after project.

  • The same estimator on every project
  • Works in your templates and formats
  • Learns your rates, trades and standards
  • Support arranged around your pipeline
Your dedicated estimatorWhole Building Estimating

How it works

Simple From Start to Finish

01

Send drawings

Share drawings, scope and deadline.

02

Scope review

We confirm deliverables and timeframe.

03

Takeoff & estimate

Quantities measured and organised.

04

Review & delivery

Checked, then delivered in your format.

FAQ

Common Questions

More answers on our FAQ page

Every trade shown on the drawings — substructure, frame, roof, envelope, internal walls, finishes, fittings, building services and external works — with preliminaries and margins shown separately. The scope is confirmed with you before work begins.

Yes. Quantities can be organised into trade packages so each subcontractor prices the same measured scope, or grouped by building element following the measurement method used in your market.

Yes. Early estimates can be prepared from concept or design development drawings, with assumptions clearly stated so the estimate can be refined as the design develops.

Because every trade is measured, a whole building estimate usually takes longer than a single-trade estimate. We confirm the delivery date after reviewing your drawings and scope, before work begins.

Related

Related Services

Architectural floor plan with dimensions, a pen and a scale ruler09

Quantity Takeoffs

Accurate measurement and quantification from project drawings.

Learn more
Estimator reviewing a CAD floor plan on a laptop beside printed drawings11

BOQ Preparation

Detailed Bills of Quantities organised for pricing and tendering.

Learn more
Calculator and pen on a printed cost breakdown sheet12

Cost Estimating

Material, labour and project cost estimating.

Learn more

Get support with whole building estimating

Send your full drawing set and scope. We will review the project and confirm deliverables and the delivery date before any work begins.

Get a Free Estimate