Material Takeoffs

Material TakeoffServices

Material takeoffs for contractors, subcontractors and suppliers — quantities measured from your drawings and specifications, organised for ordering, supplier quotes and pricing.

Need this ongoing? Get a dedicated estimator

How we take off materials

See a Material Takeoff in 3D

Every wall type is measured from the drawings, then counted into ordering units — blocks, mortar, timber, batts and plasterboard — with waste allowances shown, so the order list is ready for supplier quotes.

  1. The floor plan is read wall by wall and each type taken from the legend — W1 blockwork outside, W2 stud partitions inside.
  2. Blockwork is measured net of openings and counted at 12.5 blocks per m² plus waste, with mortar and a lintel for every opening.
  3. Studs at 600 centres, plates, noggins and door heads are measured for every partition and totalled by section.
  4. Wall batts are measured to the stud bays, openings deducted, and rounded up to full packs.
  5. Plasterboard is measured on both faces and converted to 2400 × 1200 sheets with offcuts allowed, then screws per sheet.
  6. Every line is in ordering units with its allowance stated, and grouped by delivery — ready for supplier quotes.
Material takeoff for the model shown (illustrative)
ItemQtyUnit
Concrete blocks 20.01 · 844 + 5%886nr
Mortar M3 · 67.5 m² wall0.84m³
Steel lintels galv. · 1.3–1.9 m4nr
Timber framing 90×45 MGP10 · +10%80lm
Wall batts R2.0 · 18.7 m² net4packs
Plasterboard 13 mm 2400×1200 · +10%15sheets
Screws drywall · 1 box500nr
Delivered weight 2 drops16.8t
Delivered as an Excel material schedule with marked-up drawings and order lists by drop

Illustrative single-storey site office — sample figures, not a quotation.

Scope

What’s Included

The scope is confirmed with you before work starts, so you know exactly what will be measured and priced.

01

By material type

Quantities by material, grade and size — roof sheets by profile and length, timber by section and grade, concrete by strength grade and reinforcement by bar size.

02

Core trades

Roofing, cladding, framing, structural steel, concrete, reinforcement, masonry and finishes.

03

Allowances

Laps, waste and cutting allowances as agreed with you, stated as assumptions and kept separate from net quantities.

04

Staged quantities

Grouped by level, zone or delivery stage.

05

Supplier-ready

Schedules in ordering units — m³, tonnes, sheets, lengths or pieces — laid out for supplier pricing requests.

06

Revisions

Updated quantities when drawings change.

Deliverables

What You Receive

  • 01

    Material schedule in Excel, formula-linked to the measured quantities

  • 02

    Quantities in metric or imperial units, with specifications

  • 03

    Marked-up PDF drawings showing what was measured

  • 04

    Waste and lap allowances, assumptions and exclusions

Ideal for

Who It’s For

  • Contractors ordering materials
  • Subcontractors and trade businesses
  • Suppliers preparing quotes
  • Builders checking quantities

Dedicated estimator available

Need material takeoffs every week? Get your own dedicated estimator.

Preparing material lists for every job? Add a dedicated estimator to your team who produces material takeoffs in your format, ready for ordering and supplier pricing.

  • The same estimator on every project
  • Works in your templates and formats
  • Learns your rates, trades and standards
  • Support arranged around your pipeline
Your dedicated estimatorMaterial Takeoffs

How it works

Simple From Start to Finish

01

Send drawings

Share drawings, scope and deadline.

02

Scope review

We confirm deliverables and timeframe.

03

Takeoff & estimate

Quantities measured and organised.

04

Review & delivery

Checked, then delivered in your format.

FAQ

Common Questions

More answers on our FAQ page

Waste and lap allowances can be included at percentages you specify, or shown separately so you can apply your own factors. Either way, net quantities are shown, and any allowance applied is listed in the assumptions.

Yes. Quantities can be grouped by level, zone or delivery stage to support ordering and planning.

Common trades include roofing, cladding, framing and structural steel, concrete and reinforcement, masonry, finishes, and building services such as electrical and plumbing. Send the drawings and scope to confirm.

Related

Related Services

Architectural floor plan with dimensions, a pen and a scale ruler09

Quantity Takeoffs

Accurate measurement and quantification from project drawings.

Learn more
Concrete building frame with shoring props supporting new floor slabs08

Concrete Estimating

Concrete quantities, reinforcement and related construction quantities.

Learn more
Tower cranes above a high-rise frame under construction03

Structural Estimating

Estimating support for structural and framing components.

Learn more

Get support with material takeoffs

Send your drawings and scope. Standard estimates are typically delivered within 48 hours; for larger or complex projects we confirm the delivery date after reviewing the scope, before any work begins.

Get a Free Estimate