Item descriptions
Clear, consistent descriptions for each measurable item, with references to the specification where one is provided.

BOQ Preparation
Clear, structured Bills of Quantities for contractors and subcontractors — item descriptions, units and quantities organised so every package can be priced consistently.
Need this ongoing? Get a dedicated estimatorHow we build a BOQ
Every measured quantity becomes a described item, sorted into coded sections with its unit, then preliminaries and provisional sums are added — so the bill is ready for contractors to price.
| Section | Items | Unit |
|---|---|---|
| Preliminaries P · item | 12 | nr |
| Substructure 1 · m³ m² t | 14 | nr |
| Frame 2.1 · t nr m² | 9 | nr |
| Upper floors 2.2 · m² m³ t nr m | 7 | nr |
| Roof 2.3 · m² m nr | 8 | nr |
| External walls 2.5 · m² m nr | 8 | nr |
| Windows & doors 2.6 · nr m | 6 | nr |
| Provisional & PC sums PS · sum | 6 | nr |
| Total items 8 sections | 70 | nr |
| Delivered in Excel with collection and summary pages and the supporting takeoff | ||
Illustrative two-storey shell-and-core office — sample figures, not a quotation.
Scope
The scope is confirmed with you before work starts, so you know exactly what will be measured and priced.
Clear, consistent descriptions for each measurable item, with references to the specification where one is provided.
Grouped by trade, work section or element.
Net quantities measured from the drawings in m, m², m³, t or nr (or imperial units), each traceable to the takeoff.
Preliminaries, provisional sums and allowances where required.
Rate and amount columns with formula-linked totals that roll up to the collection and summary pages.
Measured to ASMM, NRM2, CSI MasterFormat, the CIQS method or NZS 4202 — or set out in your own BOQ template.
Deliverables
Bill of Quantities in Excel, formula-linked from items to totals
Summary and collection pages
Supporting takeoff and marked-up PDF drawings showing what was measured
Assumptions, exclusions and clarifications
Ideal for
Dedicated estimator available
Preparing BOQs for every tender? Add a dedicated estimator to your team who builds them in your format, with your item descriptions and trade breakdown, project after project.

How it works
Share drawings, scope and deadline.
We confirm deliverables and timeframe.
Quantities measured and organised.
Checked, then delivered in your format.
A BOQ lists the measured items of work in a project with descriptions, units and quantities so that each item can be priced consistently.
Yes. We can prepare the BOQ in your preferred structure and format, or propose a structure suited to the project and the measurement method used in your market. Units (metric or imperial) and currency are agreed at the start.
It can be issued unpriced for tendering, or priced as part of a cost estimate — whichever you need. If priced, we use your own rates or market-based rates agreed with you before pricing.
Standard methods such as ASMM and NRM2 measure work net as fixed in place, so waste is normally allowed for in the rates rather than the quantities. If your template asks for allowances in the quantities, the percentages used are listed in the assumptions.
Send your drawings and scope. Standard estimates are typically delivered within 48 hours; for larger or complex projects we confirm the delivery date after reviewing the scope, before any work begins.