BOQ Preparation

BOQ PreparationServices

Clear, structured Bills of Quantities for contractors and subcontractors — item descriptions, units and quantities organised so every package can be priced consistently.

Need this ongoing? Get a dedicated estimator

How we build a BOQ

See a BOQ Come Together in 3D

Every measured quantity becomes a described item, sorted into coded sections with its unit, then preliminaries and provisional sums are added — so the bill is ready for contractors to price.

  1. Every element is measured from the drawings first — substructure, frame, floors, roof, walls and windows — so each quantity traces back to the takeoff.
  2. Each measured quantity becomes a BOQ item with a clear description, its unit and its quantity — 52 items lifted from the model.
  3. Items are sorted into elemental sections in NRM order, each with its reference code — substructure, frame, then upper floors.
  4. Roof, external walls and windows follow, every item coded and measured in its own unit — m², m³, m, t or nr.
  5. Preliminaries are added up front, with provisional and PC sums for work that can’t be measured yet, such as services and drainage.
  6. The sections are bound into one bill with collection and summary pages, ready for contractors to price at tender.
Bill of Quantities sections for the model shown (illustrative)
SectionItemsUnit
Preliminaries P · item12nr
Substructure 1 · m³ m² t14nr
Frame 2.1 · t nr m²9nr
Upper floors 2.2 · m² m³ t nr m7nr
Roof 2.3 · m² m nr8nr
External walls 2.5 · m² m nr8nr
Windows & doors 2.6 · nr m6nr
Provisional & PC sums PS · sum6nr
Total items 8 sections70nr
Delivered in Excel with collection and summary pages and the supporting takeoff

Illustrative two-storey shell-and-core office — sample figures, not a quotation.

Scope

What’s Included

The scope is confirmed with you before work starts, so you know exactly what will be measured and priced.

01

Item descriptions

Clear, consistent descriptions for each measurable item, with references to the specification where one is provided.

02

Logical structure

Grouped by trade, work section or element.

03

Measured quantities

Net quantities measured from the drawings in m, m², m³, t or nr (or imperial units), each traceable to the takeoff.

04

Provisional items

Preliminaries, provisional sums and allowances where required.

05

Pricing columns

Rate and amount columns with formula-linked totals that roll up to the collection and summary pages.

06

Method or template

Measured to ASMM, NRM2, CSI MasterFormat, the CIQS method or NZS 4202 — or set out in your own BOQ template.

Deliverables

What You Receive

  • 01

    Bill of Quantities in Excel, formula-linked from items to totals

  • 02

    Summary and collection pages

  • 03

    Supporting takeoff and marked-up PDF drawings showing what was measured

  • 04

    Assumptions, exclusions and clarifications

Ideal for

Who It’s For

  • Contractors preparing tenders
  • Builders issuing subcontract packages
  • Subcontractors pricing trade packages
  • Developers and project managers issuing work for pricing

Dedicated estimator available

Need BOQ preparation every week? Get your own dedicated estimator.

Preparing BOQs for every tender? Add a dedicated estimator to your team who builds them in your format, with your item descriptions and trade breakdown, project after project.

  • The same estimator on every project
  • Works in your templates and formats
  • Learns your rates, trades and standards
  • Support arranged around your pipeline
Your dedicated estimatorBOQ Preparation

How it works

Simple From Start to Finish

01

Send drawings

Share drawings, scope and deadline.

02

Scope review

We confirm deliverables and timeframe.

03

Takeoff & estimate

Quantities measured and organised.

04

Review & delivery

Checked, then delivered in your format.

FAQ

Common Questions

More answers on our FAQ page

A BOQ lists the measured items of work in a project with descriptions, units and quantities so that each item can be priced consistently.

Yes. We can prepare the BOQ in your preferred structure and format, or propose a structure suited to the project and the measurement method used in your market. Units (metric or imperial) and currency are agreed at the start.

It can be issued unpriced for tendering, or priced as part of a cost estimate — whichever you need. If priced, we use your own rates or market-based rates agreed with you before pricing.

Standard methods such as ASMM and NRM2 measure work net as fixed in place, so waste is normally allowed for in the rates rather than the quantities. If your template asks for allowances in the quantities, the percentages used are listed in the assumptions.

Related

Related Services

Architectural floor plan with dimensions, a pen and a scale ruler09

Quantity Takeoffs

Accurate measurement and quantification from project drawings.

Learn more
Calculator and pen on a printed cost breakdown sheet12

Cost Estimating

Material, labour and project cost estimating.

Learn more
Project team reviewing tender documents around a meeting table14

Tender & Bid Support

Estimating support to help contractors prepare competitive tenders.

Learn more

Get support with BOQ preparation

Send your drawings and scope. Standard estimates are typically delivered within 48 hours; for larger or complex projects we confirm the delivery date after reviewing the scope, before any work begins.

Get a Free Estimate