Rate build-ups
Each rate split into material, labour and plant, with waste and productivity assumptions shown so you can check them or apply your own.

Cost Estimating
Cost estimates for contractors and subcontractors, built up from measured quantities with material, labour and plant allowances — giving you a clear view of where project costs sit.
Need this ongoing? Get a dedicated estimatorHow we build an estimate
Measured quantities are priced at agreed rates, trade by trade, then preliminaries, overheads & profit and contingency are added — so you can see exactly where the project cost sits.
| Item | Amount | Unit |
|---|---|---|
| Concrete 100 m³ × $880 | 88,000 | $ |
| Structural steel 14.1 t × $5,600 | 78,960 | $ |
| Roofing 243 m² × $160 | 38,880 | $ |
| Cladding & glazing 538 m² × $460 | 247,480 | $ |
| Services (M&E) 512 m² GFA × $540 | 276,480 | $ |
| Preliminaries 12% of trade costs | 87,576 | $ |
| Overheads & profit 8% on trades + prelims | 65,390 | $ |
| Contingency 5% on all above | 44,138 | $ |
| Estimate total excl. tax | 926,904 | $ |
| Cost per m² ÷ 512 m² GFA | 1,810 | $/m² |
| Delivered in Excel, with detail sheets formula-linked to the summary, rate build-ups and stated assumptions | ||
Illustrative two-storey office estimate — sample figures, not a quotation.
Scope
The scope is confirmed with you before work starts, so you know exactly what will be measured and priced.
Each rate split into material, labour and plant, with waste and productivity assumptions shown so you can check them or apply your own.
Estimates at concept, design development or tender stage.
Costs summarised by trade, element or stage, or grouped by the work sections of your market’s method — ASMM, NRM2, CSI MasterFormat, CIQS or NZS 4202.
Site establishment, supervision, temporary works and other preliminaries or general conditions priced as separate items.
Your rates, supplier quotes or market-based rates agreed before pricing, in the currency agreed at the start.
Side-by-side costs for design or specification options.
Deliverables
Cost estimate in Excel, with detail sheets formula-linked to the summary
Material, labour and plant breakdown
Assumptions, exclusions and risk notes
Supporting quantities and marked-up PDF drawings showing what was measured
Ideal for
Dedicated estimator available
Estimating costs for a steady pipeline of projects? Add a dedicated estimator to your team who builds estimates with your rates, pricing basis and templates, project after project.

How it works
Share drawings, scope and deadline.
We confirm deliverables and timeframe.
Quantities measured and organised.
Checked, then delivered in your format.
Rates are agreed with you before pricing. We can use your own rates, supplier quotes you provide, or market-based rates appropriate to the project location. The rate source is stated in the assumptions, and currency and units are agreed at the start.
Yes. Early estimates are prepared from the information available, with assumptions clearly stated so they can be refined as the design develops.
No estimate can guarantee final cost. We provide a transparent, well-documented estimate so you can understand the basis of every figure.
Related
Send your drawings and scope. Standard estimates are typically delivered within 48 hours; for larger or complex projects we confirm the delivery date after reviewing the scope, before any work begins.