Concrete volumes
Measured in m³ by element, strength grade and level or pour.
Concrete Estimating
Takeoffs and estimates for concrete, formwork and reinforcement contractors — volumes, bar and mesh quantities, formwork areas and related items measured from your drawings, organised by element and pour for pricing and ordering.
Need this ongoing? Get a dedicated estimator
Typical inputs
Outputs
Formats
How we measure concrete
Footings, slabs, columns and walls are measured element by element from the structural drawings — then reinforcement and formwork are added, so the concrete schedule is ready to price and order.
| Item | Qty | Unit |
|---|---|---|
| Pad footings 1.8 × 1.8 × 0.6 · 12 nr | 23.33 | m³ |
| Ground beams 400 × 600 · 30.0 m | 7.20 | m³ |
| Ground slab 150 thk · A393 mesh | 21.71 | m³ |
| Columns 400 × 400 · 12 nr | 6.43 | m³ |
| Walls 200 thk · 8.70 m | 5.83 | m³ |
| Suspended slab 250 thk · 3 pours | 36.19 | m³ |
| Reinforcement kg/m³ by element | 9.89 | t |
| Formwork contact area | 273.4 | m² |
| Total concrete 32 MPa · +5% wastage | 105.7 | m³ |
| Delivered in Excel with concrete, rebar and formwork schedules and marked-up drawings | ||
Illustrative reinforced-concrete frame — sample figures, not a quotation.
Scope
The scope is confirmed with you before work starts, so you know exactly what will be measured and priced.
Measured in m³ by element, strength grade and level or pour.
Bar tonnage by diameter from bar schedules, or a stated kg/m³ allowance per element where none exist; mesh in m² by type, with laps as agreed.
Contact area in m² by face — slab soffits and edges, beam sides, column and wall faces — split by finish.
Footings, slabs, walls, columns and beams.
Kerbs and channels in lineal metres, pavements in m², headwalls by number and volume.
Joints and waterstops in lineal metres, membranes in m² and cast-in items counted, where shown.
Deliverables
Concrete schedule in m³ by element, grade and level
Reinforcement summary in tonnes by bar diameter, with mesh in m²
Formwork schedule in m² by element and finish
Pour-by-pour breakdown if required
Marked-up drawings and a list of assumptions, including any reinforcement allowances
Ideal for
Dedicated estimator available
Measuring concrete, reinforcement and formwork on every job? Add a dedicated estimator to your team who prepares these quantities in your format, project after project.

How it works
Share drawings, scope and deadline.
We confirm deliverables and timeframe.
Quantities measured and organised.
Checked, then delivered in your format.
Yes. Where bar schedules or detailed reinforcement drawings are available, bars are measured by diameter and length, laps included, and converted to tonnes. Where they are not, reinforcement is allowed at a kg/m³ rate for each element and stated as an assumption for you to review.
Yes, quantities can be grouped by pour, level or zone to support planning and ordering.
Yes — kerbs, channels, pavements, headwalls and retaining walls can be included.
Related
03Estimating support for structural and framing components.
Learn more
10Detailed material quantities prepared from drawings and specifications.
Learn more
06Every trade, from substructure to finishes and services, measured and priced in one complete estimate.
Learn moreSend your drawings and scope. Standard estimates are typically delivered within 48 hours; for larger or complex projects we confirm the delivery date after reviewing the scope, before any work begins.