Tender & Bid Support

Tender & BidEstimating Support

Estimating support for contractors and subcontractors around your tender deadlines — from reviewing tender documents to preparing quantities, priced BOQs and supporting schedules for submission.

Need this ongoing? Get a dedicated estimator

How we support a tender

See a Tender Come Together in 3D

From the tender pack to a priced bid — the scope split into trade packages, queries and addenda handled, quotes levelled and the tender sum built up ahead of the close.

  1. The tender pack is opened and reviewed — drawings, specification, pricing schedules and tender conditions — with missing information flagged at the start.
  2. Quantities are measured from the drawings and split into trade packages, so each one can be priced and sent out for quotes like for like.
  3. Queries are raised where the documents are unclear, each addendum is logged with its quantities updated, and clarifications are listed.
  4. Quotes are levelled like for like against each package, and the compliant, best-value price is carried into the bid.
  5. Package prices are added up with preliminaries, a risk allowance and OH&P, priced with your rates, to give the tender sum.
  6. The tender estimate, priced BOQ and clarifications schedule are checked and handed over before the close, for your team to finalise and submit.
Tender build-up for the model shown (illustrative)
ItemQtyUnit
Tender documents reviewed 24 drawings · 4 volumes28nr
Trade packages split for pricing7nr
Tender queries raised all answered6nr
Addenda incorporated 3 revised drawings1nr
Clarifications & exclusions listed with the bid9nr
Subcontractor quotes 2–3 a package18nr
Packages levelled like for like7nr
Ready before close 14-day tender period2days
Tender sum trades, prelims, risk, OH&P6,900,600$
Delivered as a tender estimate summary, priced BOQ and clarifications schedule in Excel

Illustrative three-storey office tender — sample figures, not a quotation.

Scope

What’s Included

The scope is confirmed with you before work starts, so you know exactly what will be measured and priced.

01

Document review

Drawings, specifications, pricing schedules and tender conditions reviewed at the start, with missing information and scope gaps flagged.

02

Quantities & BOQs

Measured to the method the tender calls for — ASMM, NRM2, CSI MasterFormat, the CIQS method or NZS 4202 — or set out in the bill issued with the tender.

03

Trade packages

Quantities split by trade package so subcontractor quotes can be requested and compared like for like.

04

Pricing support

Priced with your rates and supplier quotes, with material, labour and plant shown separately when requested.

05

Clarifications

Assumptions, exclusions and qualifications listed, plus queries to raise where the documents are unclear.

06

Addenda

Each addendum and drawing revision logged, affected quantities updated and changes highlighted against the previous issue.

Deliverables

What You Receive

  • 01

    Tender estimate summary

  • 02

    Priced or unpriced BOQ in Excel, in the tender’s own format where one is issued

  • 03

    Trade package quantities

  • 04

    Clarifications and exclusions schedule

  • 05

    Marked-up drawings showing what was measured

Ideal for

Who It’s For

  • Builders and contractors tendering for multiple projects
  • Subcontractors responding to tender invitations
  • Estimating teams handling tender peaks

Dedicated estimator available

Need tender and bid support every week? Get your own dedicated estimator.

Running a steady tender pipeline? Add a dedicated estimator to your team who prepares quantities, trade packages and pricing inputs for every bid, in your format.

  • The same estimator on every project
  • Works in your templates and formats
  • Learns your rates, trades and standards
  • Support arranged around your pipeline
Your dedicated estimatorTender & Bid Support

How it works

Simple From Start to Finish

01

Send drawings

Share drawings, scope and deadline.

02

Scope review

We confirm deliverables and timeframe.

03

Takeoff & estimate

Quantities measured and organised.

04

Review & delivery

Checked, then delivered in your format.

FAQ

Common Questions

More answers on our FAQ page

Tell us your submission date when you send the documents. Standard estimates are typically delivered within 48 hours; for larger or more complex tenders we confirm the delivery date after reviewing the scope, before work begins. Earlier access to tender documents allows more time for checking.

No. We prepare the estimating information; your team reviews, finalises and submits the tender.

Yes. Addenda and revised drawings can be incorporated and changes highlighted.

Related

Related Services

Estimator reviewing a CAD floor plan on a laptop beside printed drawings11

BOQ Preparation

Detailed Bills of Quantities organised for pricing and tendering.

Learn more
Calculator and pen on a printed cost breakdown sheet12

Cost Estimating

Material, labour and project cost estimating.

Learn more
Architectural floor plan with dimensions, a pen and a scale ruler09

Quantity Takeoffs

Accurate measurement and quantification from project drawings.

Learn more

Get support with your next tender

Send your drawings and scope. We will review the project and confirm deliverables and timing before any work begins.

Get a Free Estimate