Document review
Drawings, specifications, pricing schedules and tender conditions reviewed at the start, with missing information and scope gaps flagged.

Tender & Bid Support
Estimating support for contractors and subcontractors around your tender deadlines — from reviewing tender documents to preparing quantities, priced BOQs and supporting schedules for submission.
Need this ongoing? Get a dedicated estimatorHow we support a tender
From the tender pack to a priced bid — the scope split into trade packages, queries and addenda handled, quotes levelled and the tender sum built up ahead of the close.
| Item | Qty | Unit |
|---|---|---|
| Tender documents reviewed 24 drawings · 4 volumes | 28 | nr |
| Trade packages split for pricing | 7 | nr |
| Tender queries raised all answered | 6 | nr |
| Addenda incorporated 3 revised drawings | 1 | nr |
| Clarifications & exclusions listed with the bid | 9 | nr |
| Subcontractor quotes 2–3 a package | 18 | nr |
| Packages levelled like for like | 7 | nr |
| Ready before close 14-day tender period | 2 | days |
| Tender sum trades, prelims, risk, OH&P | 6,900,600 | $ |
| Delivered as a tender estimate summary, priced BOQ and clarifications schedule in Excel | ||
Illustrative three-storey office tender — sample figures, not a quotation.
Scope
The scope is confirmed with you before work starts, so you know exactly what will be measured and priced.
Drawings, specifications, pricing schedules and tender conditions reviewed at the start, with missing information and scope gaps flagged.
Measured to the method the tender calls for — ASMM, NRM2, CSI MasterFormat, the CIQS method or NZS 4202 — or set out in the bill issued with the tender.
Quantities split by trade package so subcontractor quotes can be requested and compared like for like.
Priced with your rates and supplier quotes, with material, labour and plant shown separately when requested.
Assumptions, exclusions and qualifications listed, plus queries to raise where the documents are unclear.
Each addendum and drawing revision logged, affected quantities updated and changes highlighted against the previous issue.
Deliverables
Tender estimate summary
Priced or unpriced BOQ in Excel, in the tender’s own format where one is issued
Trade package quantities
Clarifications and exclusions schedule
Marked-up drawings showing what was measured
Ideal for
Dedicated estimator available
Running a steady tender pipeline? Add a dedicated estimator to your team who prepares quantities, trade packages and pricing inputs for every bid, in your format.

How it works
Share drawings, scope and deadline.
We confirm deliverables and timeframe.
Quantities measured and organised.
Checked, then delivered in your format.
Tell us your submission date when you send the documents. Standard estimates are typically delivered within 48 hours; for larger or more complex tenders we confirm the delivery date after reviewing the scope, before work begins. Earlier access to tender documents allows more time for checking.
No. We prepare the estimating information; your team reviews, finalises and submits the tender.
Yes. Addenda and revised drawings can be incorporated and changes highlighted.
Send your drawings and scope. We will review the project and confirm deliverables and timing before any work begins.