Hours by activity
Labour hours by activity and trade — measured quantity × productivity (hours per m², m³, tonne or item).
Labour Estimating
Labour hours and costs for contractors and subcontractors, built up from measured work quantities and agreed productivity rates — helping you plan crews and price labour realistically.
Need this ongoing? Get a dedicated estimator
Typical inputs
Outputs
Formats
How we estimate labour
Measured quantities are multiplied by agreed productivity rates to give labour hours by activity — then converted to crew-days and laid out on a programme, ready to price.
| Item | Qty | Unit |
|---|---|---|
| Concrete 27.6 m³ × 2.00 hr/m³ | 55 | hr |
| Steel frame 6.6 t × 15.0 hr/t | 99 | hr |
| Decking 192 m² × 0.50 hr/m² | 96 | hr |
| Blockwork 248 m² × 1.10 hr/m² | 273 | hr |
| Roofing 104 m² × 0.50 hr/m² | 52 | hr |
| Windows & doors 19 nr × 3.00 hr/nr | 57 | hr |
| Programme peak crew 6 operatives | 4 | wk |
| Total labour 6 activities | 632 | hr |
| Man-days 632 hr ÷ 8 hr/day | 79 | days |
| Delivered as an Excel labour estimate by activity, formula-linked to the quantities | ||
Illustrative two-storey building and labour rates — sample figures, not a quotation.
Scope
The scope is confirmed with you before work starts, so you know exactly what will be measured and priced.
Labour hours by activity and trade — measured quantity × productivity (hours per m², m³, tonne or item).
Productivity rates agreed with you and stated clearly.
Crew composition and hourly cost build-ups, using your wage rates or market rates agreed with you.
Labour and plant allowances by work section.
Hours converted to crew-days, with access, sequencing or working-hour constraints noted as assumptions.
Alternative labour approaches compared on request.
Deliverables
Labour estimate in Excel by activity, formula-linked to the quantities
Hours and cost summary
Productivity and crew-rate assumptions
Supporting quantities, with marked-up drawings where we measure them
Ideal for
Dedicated estimator available
Building up labour hours and crew costs for every tender? Add a dedicated estimator to your team who works with your productivity rates and methods, project after project.

How it works
Share drawings, scope and deadline.
We confirm deliverables and timeframe.
Quantities measured and organised.
Checked, then delivered in your format.
Productivity rates are agreed with you. We can use your historical rates or proposed rates appropriate to the work and location, stated clearly in the estimate. Hourly labour costs work the same way: your own wage rates, or market rates agreed before pricing.
Yes. Estimates can show labour, material and plant separately so each can be reviewed on its own.
Yes — labour estimates can be prepared for a single trade or across the whole project.
Send your drawings and scope. Standard estimates are typically delivered within 48 hours; for larger or complex projects we confirm the delivery date after reviewing the scope, before any work begins.