Labour Estimating

Labour EstimatingServices

Labour hours and costs for contractors and subcontractors, built up from measured work quantities and agreed productivity rates — helping you plan crews and price labour realistically.

Need this ongoing? Get a dedicated estimator
Carpenter raising new timber rafters inside a house
Service 13

Typical inputs

Quantities or drawingsProductivity ratesCrew ratesProgramme constraints

Outputs

Labour estimateHours summaryCost breakdown

Formats

ExcelPDFYour template

How we estimate labour

See a Labour Estimate in 3D

Measured quantities are multiplied by agreed productivity rates to give labour hours by activity — then converted to crew-days and laid out on a programme, ready to price.

  1. Measured quantities from the takeoff or your BOQ are grouped into work packages — the starting point for every labour estimate.
  2. Each quantity is multiplied by an agreed productivity rate — hours per m³ or tonne — and a gang size is set for the work.
  3. Decking and blockwork follow, each with its own rate and gang, and the hours by activity build up beside the model.
  4. Roofing is priced per m² and windows and doors per item, completing the labour hours for every activity.
  5. Hours are converted to crew-days and laid out week by week, giving a labour histogram for planning crews.
  6. Hours are totalled and converted to man-days at an 8-hour day, ready to price with your wage rates.
Labour estimate for the model shown (illustrative)
ItemQtyUnit
Concrete 27.6 m³ × 2.00 hr/m³55hr
Steel frame 6.6 t × 15.0 hr/t99hr
Decking 192 m² × 0.50 hr/m²96hr
Blockwork 248 m² × 1.10 hr/m²273hr
Roofing 104 m² × 0.50 hr/m²52hr
Windows & doors 19 nr × 3.00 hr/nr57hr
Programme peak crew 6 operatives4wk
Total labour 6 activities632hr
Man-days 632 hr ÷ 8 hr/day79days
Delivered as an Excel labour estimate by activity, formula-linked to the quantities

Illustrative two-storey building and labour rates — sample figures, not a quotation.

Scope

What’s Included

The scope is confirmed with you before work starts, so you know exactly what will be measured and priced.

01

Hours by activity

Labour hours by activity and trade — measured quantity × productivity (hours per m², m³, tonne or item).

02

Agreed productivity

Productivity rates agreed with you and stated clearly.

03

Crew build-ups

Crew composition and hourly cost build-ups, using your wage rates or market rates agreed with you.

04

Plant allowances

Labour and plant allowances by work section.

05

Programme notes

Hours converted to crew-days, with access, sequencing or working-hour constraints noted as assumptions.

06

Option comparison

Alternative labour approaches compared on request.

Deliverables

What You Receive

  • 01

    Labour estimate in Excel by activity, formula-linked to the quantities

  • 02

    Hours and cost summary

  • 03

    Productivity and crew-rate assumptions

  • 04

    Supporting quantities, with marked-up drawings where we measure them

Ideal for

Who It’s For

  • Subcontractors pricing labour
  • Labour-only trade contractors
  • Builders and contractors planning crews
  • Project managers reviewing labour budgets

Dedicated estimator available

Need labour estimating every week? Get your own dedicated estimator.

Building up labour hours and crew costs for every tender? Add a dedicated estimator to your team who works with your productivity rates and methods, project after project.

  • The same estimator on every project
  • Works in your templates and formats
  • Learns your rates, trades and standards
  • Support arranged around your pipeline
Your dedicated estimatorLabour Estimating

How it works

Simple From Start to Finish

01

Send drawings

Share drawings, scope and deadline.

02

Scope review

We confirm deliverables and timeframe.

03

Takeoff & estimate

Quantities measured and organised.

04

Review & delivery

Checked, then delivered in your format.

FAQ

Common Questions

More answers on our FAQ page

Productivity rates are agreed with you. We can use your historical rates or proposed rates appropriate to the work and location, stated clearly in the estimate. Hourly labour costs work the same way: your own wage rates, or market rates agreed before pricing.

Yes. Estimates can show labour, material and plant separately so each can be reviewed on its own.

Yes — labour estimates can be prepared for a single trade or across the whole project.

Related

Related Services

Calculator and pen on a printed cost breakdown sheet12

Cost Estimating

Material, labour and project cost estimating.

Learn more
Timber wall framing inside a building under construction10

Material Takeoffs

Detailed material quantities prepared from drawings and specifications.

Learn more
Project team reviewing tender documents around a meeting table14

Tender & Bid Support

Estimating support to help contractors prepare competitive tenders.

Learn more

Get support with labour estimating

Send your drawings and scope. Standard estimates are typically delivered within 48 hours; for larger or complex projects we confirm the delivery date after reviewing the scope, before any work begins.

Get a Free Estimate